Pages

Sunday, December 9, 2012

Progress on Easy Street and BIMB Row Along

I have had a very productive weekend, and it is not even over yet!

The two first parts of Easy Street are completed, and Row#8 in Bee In My Bonnet Row Along is also done.

Easy Street: 128 flying geese and 192 4-patches


BIMB: All the 8 rows on my porch in poor winter daylight


BIMB: Left part of row#8


BIMB: Right part of row#8

The rest of the day will be dedicated to basting a twin sized quilt for my son, and maybe I will be able to just start on Part 3 of Bonnie's Mystery.

4 comments:

  1. Parts 1 and 2 look great! It's coming along!

    ReplyDelete
  2. Your Easy Street looks good. I'm still working on part 2. I need to hurry and catch up before next Friday, don't I? Have been too busy with work and Christmas parties to get it all done so quickly.

    ReplyDelete
  3. P.S. I see you follow Hyacinth QD too. She is my neighbor and belongs to one of my quilt guilds too.
    It's a small world after all. :)

    ReplyDelete
  4. Your patches look fantastic. Clue 4 is nearly here – woo hoo!

    ReplyDelete

I love comments! Thanks for stopping by and taking the time to leave me a quick note!